A rooftop solar plant is more than panels on a roof. Grid synchronization, net-metering and the MNRE subsidy each need drawings and documents in the right order. Here is how that process works on an Augzet project.
A grid-connected solar plant often makes more power than the building uses at midday and less than it needs at night. Net-metering is the arrangement with the utility, KSEB in Kerala, that lets the plant export its surplus to the grid and lets you draw from the grid when the plant is not producing, with the two accounted for against each other.
The MNRE rooftop solar subsidy is registered through documentation that goes with the project: the drawing set, the plant details and the commissioning records. Augzet prepares that documentation as part of the project, not afterwards, and registers the subsidy at commissioning. One client's subsidy was credited 40 days after commissioning. That is our fastest, not a guarantee, because processing times vary.
Subsidy eligibility, rates and procedures depend on the scheme in force and on the type of installation, and they can change. We confirm the current position for your roof and your connection when we scope the work, before you commit.
A physical site survey and a simulation-backed design, so the plant is sized against what you use.
The drawing set and project documents are prepared as part of the work, so each approval stage has what it needs.
Installation by the engineers who designed the plant, followed by grid synchronization and net-metering.
MNRE subsidy registered at commissioning, then documentation handover and maintenance plan options.
Common Questions
Our fastest was credited 40 days after commissioning. That is not a guarantee (processing times vary), but it is achievable because we prepare the drawing set, documentation and registration as part of the project rather than afterwards.
Yes. Grid synchronization and net-metering are part of the package, along with the documentation each stage requires.
No. Eligibility and processing times vary. Our fastest credit came 40 days after commissioning, and we tell you what to expect for your project before you commit.
We do. The drawing set, documentation and registration are prepared as part of the project.