KSEB net-metering and solar subsidy in Kerala

A rooftop solar plant is more than panels on a roof. Grid synchronization, net-metering and the MNRE subsidy each need drawings and documents in the right order. Here is how that process works on an Augzet project.

A commercial rooftop solar array installed by Augzet Engineers, panels racked in rows across a warehouse roof in Ernakulam.
Commercial rooftop array · Ernakulam

What net-metering does

A grid-connected solar plant often makes more power than the building uses at midday and less than it needs at night. Net-metering is the arrangement with the utility, KSEB in Kerala, that lets the plant export its surplus to the grid and lets you draw from the grid when the plant is not producing, with the two accounted for against each other.

What the subsidy process involves

The MNRE rooftop solar subsidy is registered through documentation that goes with the project: the drawing set, the plant details and the commissioning records. Augzet prepares that documentation as part of the project, not afterwards, and registers the subsidy at commissioning. One client's subsidy was credited 40 days after commissioning. That is our fastest, not a guarantee, because processing times vary.

What Augzet handles

  • Site survey, shading study and simulation before anything is ordered
  • Drawing set and documentation for each stage
  • Grid synchronization and net-metering documentation
  • MNRE subsidy processing
  • Documentation handover and annual maintenance plan options

What we confirm for your project

Subsidy eligibility, rates and procedures depend on the scheme in force and on the type of installation, and they can change. We confirm the current position for your roof and your connection when we scope the work, before you commit.

How It Runs

From drawings to credited subsidy

01

Survey & design

A physical site survey and a simulation-backed design, so the plant is sized against what you use.

02

Documentation

The drawing set and project documents are prepared as part of the work, so each approval stage has what it needs.

03

Installation & grid sync

Installation by the engineers who designed the plant, followed by grid synchronization and net-metering.

04

Subsidy & handover

MNRE subsidy registered at commissioning, then documentation handover and maintenance plan options.

Common Questions

Before you ask

How long does the MNRE subsidy take?

Our fastest was credited 40 days after commissioning. That is not a guarantee (processing times vary), but it is achievable because we prepare the drawing set, documentation and registration as part of the project rather than afterwards.

Do you handle net-metering with KSEB?

Yes. Grid synchronization and net-metering are part of the package, along with the documentation each stage requires.

Is the subsidy guaranteed?

No. Eligibility and processing times vary. Our fastest credit came 40 days after commissioning, and we tell you what to expect for your project before you commit.

Who does the paperwork?

We do. The drawing set, documentation and registration are prepared as part of the project.